• Latest
  • Trending
  • All

China-Laos 500-kV power interconnection project officially commences operation

April 29, 2026

Interview: IMF official says conflict-induced energy shock may nudge renewables shift

July 25, 2026

"Chinese + TCM" South Island Roadshow held in Christchurch, New Zealand

July 25, 2026

Thai PM pledges economic relief, structural reforms in policy statement

July 25, 2026

Japanese gov't should apologize over Chinese embassy intrusion: local media

July 25, 2026

2026 Outdoor Adventure and Travel Show held in Vancouver

July 25, 2026

World Art Day marked in Yaounde, Cameroon

July 24, 2026

Canada's Burnaby city apologizes to Chinese Canadians for "historic discrimination"

July 24, 2026

CBA regular season recap: Dynasty dreams amid rising stakes

July 24, 2026

Asia-Pacific Community: Heart to heart: China-backed CHD care project launched for Mekong children

July 24, 2026

South Africa welcomes ceasefire arrangement on Iran conflict

July 24, 2026

Chinese language competition held to mark UN Chinese Language Day in Nis, Serbia

July 24, 2026

Spring view of London in Britain

July 24, 2026
  • About
  • Advertise
  • Privacy & Policy
  • Contact
Thursday, August 20, 2026
  • Login
Worldlyze
  • Home
    • Home – Layout 1
    • Home – Layout 2
    • Home – Layout 3
    • Home – Layout 4
    • Home – Layout 5
No Result
View All Result
Worldlyze
No Result
View All Result
Home Asia News

China-Laos 500-kV power interconnection project officially commences operation

by Sean
4 months ago
in Asia News
0
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter



Lao Prime Minister Sonexay Siphandone (C) attends a commissioning ceremony for the China-Laos 500 kV power grid interconnection project in Vientiane, Laos, April 20, 2026. A commissioning ceremony for the China-Laos 500 kV power grid interconnection project was held simultaneously on Monday in Lao capital Vientiane and Kunming in southwest China’s Yunnan Province, marking a significant boost in power connectivity and mutual support capacity between the two countries. More than 100 representatives from government and business sectors of both China and Laos attended the ceremony in Vientiane, where Lao Prime Minister Sonexay Siphandone pressed the start button for the project. (Photo by Kaikeo Saiyasane/Xinhua)

VIENTIANE, April 21 (Xinhua) — A commissioning ceremony for the China-Laos 500 kV power grid interconnection project was held simultaneously on Monday in Lao capital Vientiane and Kunming in southwest China’s Yunnan Province, marking a significant boost in power connectivity and mutual support capacity between the two countries.

More than 100 representatives from government and business sectors of both China and Laos attended the ceremony in Vientiane, where Lao Prime Minister Sonexay Siphandone pressed the start button for the project.

In his speech, Meng Zhenping, chairman of China Southern Power Grid Co., Ltd. (CSG), said the project will enable two-way power transmission capacity of up to 1.5 million kilowatts. It is expected to deliver an average of 3 billion kilowatt-hours of clean energy annually, supporting the transition to greener, low-carbon energy systems and bringing tangible benefits of modernization to people in both countries.

Lao Minister of Industry and Commerce Malaithong Kommasith said the project will become a key artery in the country’s power sector once operational. He noted that it will help ease domestic transmission constraints and support the development of renewable energy in northern Laos.

In her address, Chinese Ambassador to Laos Fang Hong described the project as a “green energy artery” that enhances bilateral connectivity. She added that China is ready to use such initiatives as a model to deepen cooperation in new energy, support Laos’ energy transition, and advance bilateral ties to a broader scope, deeper level, and higher standard, injecting sustained momentum into building a closer China-Laos community with a shared future.

The project is a key initiative under the China-Laos action plan for building a community with a shared future. Construction began in February 2025.

The transmission line stretches 177.5 kilometers, linking China’s Yunnan Province with the northern Lao provinces of Oudomxay and Luang Namtha. Of the total length, 145 km is located in China and 32.5 km in Laos.

The respective sections are constructed and operated by the CSG and the Electricite du Laos Transmission Company Limited (EDL-T). ■



Source link

Tags: asia & pacificphotos
Share196Tweet123
  • Trending
  • Comments
  • Latest

Bahia rallies late to hold Santos

May 2, 2026

China strengthens customs IPR protection, steps up crackdown on infringement

May 7, 2026

Stomach virus forces Swiatek out of Madrid Open

May 2, 2026
China confers highest youth honor on 29 individuals, 30 organizations

China confers highest youth honor on 29 individuals, 30 organizations

0

China Focus: Chinese navy hospital ship treats over 26,000 in longest overseas medical mission

0

Senior CPC official stresses correct understanding of governance performance at all levels

0

Interview: IMF official says conflict-induced energy shock may nudge renewables shift

July 25, 2026

"Chinese + TCM" South Island Roadshow held in Christchurch, New Zealand

July 25, 2026

Thai PM pledges economic relief, structural reforms in policy statement

July 25, 2026
Worldlyze

Copyright © 2026 Worldlyze.

Navigate Site

  • About
  • Advertise
  • Privacy & Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home

Copyright © 2026 Worldlyze.